Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | Free Spare Parts, Field Installation, Commissionin |
Still deciding? Get samples of US$ 189/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Mechanical jack is powered by human through screw pair drive, screw rod or nut sleeve as the jacking parts. Common screw jack rely on screw self-locking effect by supporting weight, simple structure, but the transmission efficiency is low, return slowly.Lower screw jack without self-locking effect, equipped with brakes.Relax brakes, can be self-rapid decline in weight, shorten turnaround times, but this jack more complex structures. Jackscrew long-term support heavy loads, max weight reached 100 tons, used widely. After the bottom is mounted horizontal screw rod,the machine can make the weight for the small distance traversed.
1.in accordance with DIN 7355.
2.suitable for lifting loads of any type.
3.with lifting body.
4.safety crank with folding handle.
5.lifting either with fixed toe or on clawed head.
6.all construction components standardized.
7.low expenditure of force through optimal ratio
Lead Time:
Quantity(Pieces) | 1 - 100 | 101 - 500 | 501 - 1000 | >1000 |
Est. Time(days) | 9 | 18 | 21 | To be negotiated |
1.What's your product range?
Magnetic Lifters
Hand pallet truck
JM/JK Electric winch
G80,G70,G43,G30 lifting chain
Hoist: Chain hoist , electric wire rope hoist Lever Hoist
Electric trolley
2.When Can I get the quotation?
We usually quote within 24 hours after we get your inquiry .
3.How can I get a sample to check your quality?
After price confirmation, If you need the samples, you need pay the express fee and the sample cost
4.What about the lead time for mass production?
we can sure within 10-20 days delivery time, but depends on the quantity !